Panels on your roof supply power to the house during the day. Extra units go to the grid through a net meter and are adjusted against your electricity bill. At night, or when solar is not enough, power comes from the grid as usual.
We install panels from Tata Power Solar, Adani Solar and Usha. The brand mainly changes the price and the warranty terms, and we show the options side by side in your quotation.
Every size is available with Tata, Adani or Usha panels. Not sure which you need? Send us your electricity bill.
| System | Units per month | Roof area | Panels | Usually suits | |
|---|---|---|---|---|---|
| 3 kW | about 360 | 300 sq.ft | about 6 | 1–2 BHK homes | Enquire |
| 4 kW | about 480 | 400 sq.ft | about 8 | 2 BHK with AC | Enquire |
| 5 kW | about 600 | 500 sq.ft | about 10 | 3 BHK homes | Enquire |
| 6 kW | about 720 | 600 sq.ft | about 12 | Larger homes | Enquire |
| 8 kW | about 960 | 800 sq.ft | about 16 | Villas, several ACs | Enquire |
| 10 kW | about 1,200 | 1,000 sq.ft | about 20 | Shops, small offices | Enquire |
| 12 kW | about 1,440 | 1,200 sq.ft | about 24 | Commercial buildings, apartments | Enquire |
Generation is estimated at about 4 units per kW per day and changes with location, roof direction, shading and season.
Under the PM Surya Ghar Muft Bijli Yojana, homeowners installing rooftop solar can claim a central subsidy, paid into their bank account. We register you on the national portal, apply for net-metering with TGSPDCL and complete the documents.
Applies to residential connections only. Amounts can change; we confirm the current figures in your quotation.
| System size | Central subsidy |
|---|---|
| Up to 2 kW | ₹30,000 per kW |
| 3rd kW | ₹18,000 |
| 3 kW and above | ₹78,000 maximum |
About 100 sq.ft of shadow-free roof per kW. A 5 kW system needs about 500 sq.ft.
Panels produce less on cloudy days and nothing at night. With an on-grid system you draw from the grid when solar is not enough, and the net meter balances it out.
Residential electricity connections that install rooftop solar through the national portal. Commercial connections are not eligible.
The physical installation usually takes 1 to 3 days. Approvals and net-meter fitting depend on the electricity board.
Call or WhatsApp with what you need. For construction and solar we visit the site before giving a quote.
H.No: 1-1-29/10/1/19, JK Nagar Colony, Kapra, Medchal–Malkajgiri, Hyderabad, Telangana 500062