How an on-grid system works

Panels on your roof supply power to the house during the day. Extra units go to the grid through a net meter and are adjusted against your electricity bill. At night, or when solar is not enough, power comes from the grid as usual.

We install panels from Tata Power Solar, Adani Solar and Usha. The brand mainly changes the price and the warranty terms, and we show the options side by side in your quotation.

Typical 3 kW home system

  • Generationabout 12 units a day, 360 a month
  • Roof spaceabout 300 sq.ft, shadow-free
  • Panelsabout 6, depending on wattage
  • Subsidyup to ₹78,000 for homes (PM Surya Ghar)

System sizes

Every size is available with Tata, Adani or Usha panels. Not sure which you need? Send us your electricity bill.

SystemUnits per monthRoof areaPanelsUsually suits
3 kWabout 360300 sq.ftabout 61–2 BHK homesEnquire
4 kWabout 480400 sq.ftabout 82 BHK with ACEnquire
5 kWabout 600500 sq.ftabout 103 BHK homesEnquire
6 kWabout 720600 sq.ftabout 12Larger homesEnquire
8 kWabout 960800 sq.ftabout 16Villas, several ACsEnquire
10 kWabout 1,2001,000 sq.ftabout 20Shops, small officesEnquire
12 kWabout 1,4401,200 sq.ftabout 24Commercial buildings, apartmentsEnquire

Generation is estimated at about 4 units per kW per day and changes with location, roof direction, shading and season.

Government subsidy

Under the PM Surya Ghar Muft Bijli Yojana, homeowners installing rooftop solar can claim a central subsidy, paid into their bank account. We register you on the national portal, apply for net-metering with TGSPDCL and complete the documents.

Applies to residential connections only. Amounts can change; we confirm the current figures in your quotation.

System sizeCentral subsidy
Up to 2 kW₹30,000 per kW
3rd kW₹18,000
3 kW and above₹78,000 maximum

What is included

  • Solar panels from your chosen brand
  • Grid-tie inverter sized to the system
  • Galvanised mounting structure
  • Earthing, lightning arrester, ACDB and DCDB
  • DC and AC cabling
  • Net-meter application and coordination
  • Subsidy registration for homes
  • Panel cleaning and maintenance on request

Installation steps

  1. Site surveyRoof area, direction, shading and your electricity bill.
  2. Design and quotationSystem size, brand options and an item-wise quote.
  3. ApprovalsPortal registration and net-meter application.
  4. InstallationStructure, panels, inverter, wiring and earthing.
  5. Inspection and net meterElectricity board inspection and meter fitting.
  6. Switch-onSystem goes live; we help with the subsidy claim.

Common questions

How much roof space do I need?

About 100 sq.ft of shadow-free roof per kW. A 5 kW system needs about 500 sq.ft.

Does solar work on cloudy days or at night?

Panels produce less on cloudy days and nothing at night. With an on-grid system you draw from the grid when solar is not enough, and the net meter balances it out.

Who can get the PM Surya Ghar subsidy?

Residential electricity connections that install rooftop solar through the national portal. Commercial connections are not eligible.

How long does installation take?

The physical installation usually takes 1 to 3 days. Approvals and net-meter fitting depend on the electricity board.

Talk to us about your work

Call or WhatsApp with what you need. For construction and solar we visit the site before giving a quote.

Office

H.No: 1-1-29/10/1/19, JK Nagar Colony, Kapra, Medchal–Malkajgiri, Hyderabad, Telangana 500062

Open in Google Maps

Phone

+91 96669 19355
+91 96667 19555

Hours

Monday to Saturday, 9 am to 7 pm